CSTM Resources Ltd

Consulting Engineering

HRM required the timber deck on the bridge structure to be replaced.  An assessment of the substructure confirmed that the alternative of using a precast concrete deck would be a more economical replacement and would provide a longer serviceable life of the structure.

Little Fox Lane, HRM

CSTM Logo

English River Bridge, Ont.

Bill completed the visual inspection of  a 113 m single span Bowstring Arch structure with a concrete deck.