CSTM worked with the supplier to provide engineered drawings for a  40’ x 100’ x 16’ high structure. 

These pre-engineered building kits use heavy-duty 2"x3" and 2"x4" rectangular galvanized steel tubing  and use a slip-fit connection which make assembly quick and easy, with out the additional cost for labour and materials associated with heavy structural steel framed buildings

Tractor Dome, Milfrod, NS

CSTM Logo

Fero Waste Facility, Bathurst, NB

An expansion project by the owner required a structure that could be tied into the existing facility with minimal disturbance to existing operations.  CSTM worked with the owner and the supplier of the 40’x40’ x16’ tube steel framed structure to develop the foundation design and building tie in details.

Halifax C&D, Milford, NS

CSTM worked with the supplier to provide engineered drawings for 2 - 40’ x 100’ x 16’ high structure. 

These structures were supported on block foundations with tire derived aggregate.  TDA is made by shredding tires into pieces from 25mm to 300mm  for lightweight engineering fill. This product is a cost-effective alternative in engineering applications where the ground is unable to support the weight of gravel.